banner

NEWS

CONTACT US


Tel: 86-379-65160016

Fax: 86-379-65160018

Email: export@lylzzg.com

How to choose sand making equipment for a sand making plant?

2021-10-19

Sand making equipment
Feeder + Jaw Crusher + Counterattack Crusher + Sand Making Machine + Vibrating Screen

It is suitable for sand and gravel plants with medium and low hardness. Its advantages are high yield and good grain shape.

Feeder + Jaw Crusher + Cone Crusher + Sand Making Machine + Vibrating Screen

It is suitable for sand and gravel plants whose raw materials are extremely hard or (such as granite, river pebble, silica, etc.). It is characterized by high output, less equipment wear, more durable, and high market price.

Feeder + hammer breaking + counterattack breaking + sand making machine + vibrating screen

It is suitable for sand and gravel plants with medium and low hardness (limestone, bluestone, dolomite), etc. It has a simple process, a small area, and can be formed by hammering at one time with low cost.

sand making plant

Make money by running a sand factory
What are the specific costs of the equipment in the sand and gravel plant?
1. Early expenditures
Such as the recruitment and training of relevant personnel, equipment packaging, calibration, certification and other expenses.
2. Transportation, installation and relocation costs
The cost of equipment transportation, installation and relocation, plus the sum of the cost of removal, relocation and clearance. The installation costs include the cost of steel bars and concrete materials used in the foundation, labor costs, and costs for hoisting and coordinating equipment.
3. Later operating costs
Including but not limited to operating costs such as lubrication, repairs, maintenance, and power consumption.
The daily operating expenses of the sand and gravel plant include water and electricity costs for production and consumption, wages for employees and management personnel, equipment maintenance and replacement costs for wearing parts, profit tax, etc.

From the above introduction, it can be seen that the budget for investment in sand and gravel plants is very diverse. Taking a 500t/h production line as an example, it usually requires several to tens of millions. The key step is to be able to design a reasonable equipment. Configure the plan to reduce the mid-term and late-term budget of the project.
After calculating the investment, what is the income?

for example:
The hourly output of a sand making plant is about 100 tons, and it can produce 800 tons of sand when working for 8 hours a day. According to the market in Henan, the profit will be 46,000-50,000 per day after selling out, and the initial investment cost can be earned in about one month. Back to

CONTACT

If you have any question, please click here for live help. If you have any question, please click here for live help.