What is the application value of dried coal slime?
The coal slime dryer adopts a new technology that first crus…
Tel: 86-379-65160016
Fax: 86-379-65160018
Email: export@lylzzg.com
2022-09-15
In the Yalong River Basin, Jinping II Hydropower Station has built the first spatial curve tape machine and the first sand and gravel processing system in the hydropower industry; It is a breakthrough to fill the technical gap of artificial material yard shaft mining.
In August 2012, Tan Jingyi, an academician of the Chinese Academy of Engineering, visited the sand and gravel system at the east end of Jinping II Hydropower Station. Priority is given to use in engineering construction.
The sand and gravel system at the east end of Jinping is the first domestic hydropower project to use marble to produce artificial sand and gravel. The production capacity of finished aggregate is 580 tons per hour, and the processing capacity of wool is 800 tons per hour. The space curve belt conveyor transportation system has a total length of 6.96 kilometers. It has the function of “continuous slag discharge and return material carrying”. It has the characteristics of long distance, large transportation volume and high belt speed. It is the first time to use it in my country’s hydropower construction.
It is worth mentioning that the east end sand and gravel aggregate production system adopts a dry production method. In order to solve the problems of high content of sand and gravel powder and unstable fineness modulus of marble products, the Seventh Bureau of Hydropower has carried out many trials and researches, and realized a great leap from wet sand making to dry sand making, forming a large number of industrial scientific researches. results.